LOT 7 (10) HUGH EDWARDS DRIVE, PERTH AIRPORT

PROJECT DETAILS

Project Type Office & Warehouse Facility
Client CHS Pharmecuticals
Completion Date 2017
Project Size 700sqm Office and 5800sqm Warehouse
Insert here Insert here

SCOPE OF PROJECT

This project has one of the most state of the art Fit-Outs that West Construction has undertaken. This included a full temperature controlled warehouse as requested by the Client. The whole warehouse was insulated to achieve a R-Value of 5.0 and above.

The installation of two load docks were undertaken by West as part of a requirement of the client which were retro-fitted once the property was completed.

Rapid doors were also installed to limit temperature loss throughout the warehouse when unloading and offloading distribution vehicles.